BP CUTE Hydrogen Refueling Station
|
|
|
|
|
|
Status
|
out of operation
|
|
Start date - end date
|
24.11.2001 - 06.06.2006
|
|
Last changes
|
09.03.2007
|
|
Public access
|
|
|
Location
|
exact location is unknown
Show Station on map
|
|
Goal
|
As part of the EC funded CUTE-project the station supplied 3 buses with hydrogen.
|
|
Description
|
The bp CUTE installation in Porto was part of a site that is used to park, maintain and refuel the buses operated by STCP working in Porto's metropolitan area.
Hydrogen was generated with an on-site steam reformer based on natural gas. The compressor station was designed to produce the high pressure GH2 quantities needed for 3 buses, along with backup high pressure storage, in order not to compromise the filling times specifications, with back-to-back filling operations. Components: Steam reformer, Compressor
High pressure storage (backup), Dispenser
|
|
Operator
|
|
|
Technology provider
|
|
|
Further partners
|
STCP
|
|
Fuel
|
|
|
Hydrogen supply
|
steam reforming - on-site of natural gas
|
|
Hydrogen storage
|
|
|
Vehicles served
|
3 DaimlerChrysler Citaro FC buses
|
|
Station-contact
|
|
|
Station-site
|
www.fuel-cell-bus-club.com
|
|
Comments
|
The demonstration of the FC buses in Porto taked place under extreme geographical conditions. The operation on hilly topography and in hot climate allowed the project to exploit the infuence of extreme operating conditions. The buses operated on a circular line crossing the city center and with high throughput of passengers.
|
|
LBST-Info
|
This Information is provided by LBST. LBST Station ID: 039 Please notice the Terms of Use. If you need more information or maps, please click here.
|
 | Loading… |
|
|
 | Loading… |
|
|
 | Loading… |
|
|
|
 | Loading… |
If you wish to submit station data and/or images, please supply such according to this template
and send it to webmaster@h2stations.org.