ANNEX III: CONFORMITY ASSESSMENT PROCEDURES

Guidelines

CONFORMITY ASSESSMENT PROCEDURES

The obligations arising from the provisions on pressure equipment in this Annex also apply to assemblies.

Module overview

see also:

Module A (internal production control)

Module A1 (internal manufacturing checks with monitoring of the final assessment)

Module B (EC type-examination)

Module B1 (EC design-examination)

Module C1 (conformity to type)

Module D (production quality assurance)

Module D1 (production quality assurance)

Module E (product quality assurance)

Module E1 (product quality assurance)

Module F (product verification)

Module G (EC unit verification)

Module H (full quality assurance)

Module H1(full quality assurance with design examination and ...)